The light rail construction work right now

Keep updated on the light rail construction work in the municipality of Lyngby-Taarbæk right now: Buddingevej, Lyngby Centrum, Klampenborgvej and Lundtoftegårdsvej/DTU.

Read more about the areas below. This site is monthly updated.

Udsigt fra viadukten
Udsigt fra viadukten
  • Buddingevej

    At Buddingevej the light rail construction work is currently going on between the viaduct (under the S-train line) and the municipal boundary. Travellers vil face inconvenience as the road works affects the car traffic, pedestrians and cyclists.  

    There is an ongoing increased communication effort from both Lyngby-Taarbæk Muncipality and Hovedstadens Light Rail regarding challenged accessibility near Buddingevej. 

    The markings on the picture mean the following:

    • Blue marking shows that the TS phase starts or has started 
    • Blue and red-striped markings show that there are mixed working phases 
    • Red marking shows that there is an area with soil and concrete work. 

     

    Buddingevej november 2023
    Buddingevej november 2023

    1: Engelsborgvej to Jernbanepladsen (Odd house numbers)

    • The work in the eastern side of Buddingevej (the odd house numbers) is expected to be completed ultimo November 2023.
    • Closed due to curb and asphalt work 
    • Vinkelvej blocked
    • Detour via Chr. X's Alle and Lyngby Hovedgade 

     

    2: The intersection at Engelsborgvej

    • The work in the intersection is expected to be completed medio November 2023.
    • It is not possible to drive through the intersection from Engelsborgvej.
    • Residents in area 2 and 3 must drive along Chr. X's Allé 
    • The cycle path is two-way in the eastern side of Buddingevej.
    • Engelsborgvej closed due to curb and asphalt work until medio November
    • Rail will be laid after asphalt work

     

    3: The section between Engelsborgvej to Chr. X's Allé

    • Rails will be laid on the section towards the end of the year
    • There is acess to homes on both the eastern and western side of Buddingevej
    • The cycle path is two-way in the eastern side of Buddingevej.

     

    4: The section between Chr. X's Alle and Nybrovej

    • The work is expected to be done ultimo October 2023.
    • The section from Chr. X's Allé to Nybrovej is undirectional in the northern direction
    • The cycle path is two-way in the eastern side of Buddingevej.
    • There is only acess to homes on the eastern side by car. The houses on the western side can be acessed by pavement. 

     

    5: From Nybrovej to Fort Allé (the municipality boarder)

    • The work is expected to be done November 2023.
    • The section between Nybrovej and Fort Allé is one-way in a northern direction. 
    • The cycle path is two-way in the eastern side of Buddingevej.
    • The acess to homes in the western side will be open ultimo October

     

  • Centre of Lyngby

    The Greater Copenhagen Light Rail is working in the Centre of Lyngby and the road work is affecting the car traffic, pedestrians and cyclists.

    We therefore recommend you to search for alternative routes: orange (from Copenhagen to Centre of Lyngby + From Centre of Lyngby to Kongevejen), blue (from Kongevejen to Centre of Lyngby + from Centre of Lyngby to Copenhagen + from Centre of Lyngby to Buddingevej), purple (bus from Centre of Lyngby to Buddingevej)

    The markings on the picture mean the following:

    • Blue marking shows that the TS phase starts or has started 
    • Blue and red-striped markings show that there are mixed working phases 
    • Red marking shows that there is an area with soil and concrete work. 

     

    Lyngby Centrum november 2023
    Lyngby Centrum november 2023

    1: Jernbanepladsen to Lyngby Torv

    • The construction work is expected to be done ultimo 2024.
    • The light rail station is being built here and due to that the traffic to/from Jernbanepladsen is affected.
    • New driving lanes and light rail tracks are being established at Lyngby Station.
    • The bus routes from Lyngby Station will be rescheduled for a longer period via, among other things, Gl. Jernbanevej

     

    2: Lyngby Hovedgade / Klampenborgvej

    • The work in the intersection is expected to be done in the Autumn 2023.
    • In the intersection new signal systems will be established.
    • There has been etablished a temporary signal system

     

    3: Lyngby Hovedgade to Kanalvej

    • The construction work is expected to last until medio 2023.
    • Klampenborgvej has been permanently closed for car traffic from Lyngby Hovedgade to Kanalvej. On this section a new temporary urban space has been established and has been open since medio May 2023
    • There will remain access to parking under Lyngby Storcenter.

     

    4: Kanalvej

    • The construction work will be done Autumn 2023.
    • The lane for cars on Kanalvej will be extended. 

     

    4: Kanalvej / Klampenborgvej 

    • The construction work is expected to be done Autumn 2023. 
    • The work in the intersection will be done in several phases. There will be traffic in both directions across Klampenborgvej and through Kanalvej. There will be limited accessibility due to traffic diversions and temporary signaling systems. 

     

  • Klampenborgvej

    The Greater Copenhagen Light Rail is working multiple places at Klampenborgvej which affects both the car traffic, pedestrians and cyclists.

    The markings on the picture mean the following:

    • Blue marking shows that the TS phase starts or has started 
    • Blue and red-striped markings show that there are mixed working phases 
    • Red marking shows that there is an area with soil and concrete work. 

     

    Klampenborgvej november 2023
    Klampenborgvej november 2023

    1: From Kanalvej to Firskovvej

    • Construction work is expected to be completed in Autumn 2023. 
    • Bicycles and pedestrians have access via the eastern cycle path/ pavement. 
    • The bridge under Nærum Lokalbane is being reinforced and the driving lanes from Kanalvej to Firskovvej are being expanded. 

     

    2: From Firskovvej to Lundtoftegårdsvej

    • The construction work is expected to be done by Autumn 2023.
    • The light rail will be established in the northern side of Klampenborgvej between Firskovvej and Cirkel K gas station. 
    • The section will be closed in 3 weeks (week 44-46) because of asphalt work. 

     

    3: Firskovvej intersection

    • The work in the intersection is expected to be done by Autumn 2023.
    • During this period the intersection will be expanded, a cycle path will be established and new crossovers through Klampenborg wil be made. 
    • The work will be done in different stages, so the traffic can run as best as possible 

     

    4: Ermelundsstien to Klampenborgvej

    • The construction work is expected to be done ultimo 2024
    • The work will include a restructuring of Ermelundsstien
    • There will be established a transformerstation for the light rail 
    • There will be established a temporary path for cycles and pedestrians. 

     

  • DTU and Lundtoftegårdsvej

    The work is coordinated between The Greater Copenhagen Light Rail, DTU and Movia.

    The markings on the picture mean the following:

    • Blue marking shows that the TS phase starts or has started 
    • Blue and red-striped markings show that there are mixed working phases 
    • Red marking shows that there is an area with soil and concrete work. 


    DTU
    DTU

    1: Lundtoftegårdsvej

    • The construction work will be done Autumn 2023.
    • The work contains of an expansion of the intersection at Circle K Lyngbygårdsvej/Lundtoftegårdsvej and new lanes for cars.
    • The western side of Lundtoftegårdsvej will be prepared for establishing the light rail. Due to this the intersection at Lyngbygårdsvej will be closed for a period.
    • There will be made a new road course at Lundtoftegårdsvej

     

    2: Akademivej to Anker Engelunds Vej

    • This work is expected to be done by Autumn 2023.
    • The work indcludes the construction of a light rail section on the southern side of Akademivej and on Asmussens Allé 
    • The intersection at Akademivej/ Kollegiebakken will be rebuild during the period 
    • The work includes a establishment of a light rail station at Akademivej 
    • Asmussens Allé will be permanently closed to car traffic. 

     

    3: Asmussens Allé to Lundtoftegårdsvej

    • This work is expected to be done by Autumn 2023. 
    • Anker Engelunds Vej will be closed from Asmussens Allé to Lundtoftegårdsvej. Drive by an alternative route by Akademivej and Lundtoftevej. 
    • The construction work includes reinforcement of DTU service tunnels and extensions of carriageways.
    • The establishment of a light rail station at Anker Engelundsvej. 

     

    4: Lundtoftegårdsvej to Lundtofte Station 

    • The construction work in this area is expected to last until Autumn 2023.
    • The light rail will be established by Helsingørmotorvejen. 
    • There will be established a light rail station at Rævehøjvej and Lundtofte
    • The pedestrians around Rævehøjvej Station will be affected by the construction work. 

     

    5: Lundtoftegårdsvej/ Anker Engelunds Vej intersection 

    • The construction work in this area is expected to last until Autumn 2023.
    • The work includes the establishment of  the light rail across Lundtoftegårdsvej. 
    • There will also be established a new signal system. 
    • A temporary signal system has been established. There might be a longer travel time in this area. 

     

    6: Lundtoftegårdsvej/ Akademivej intersection

    • The construction work in this area is expected to last until ultimo 2024
    • The construction work includes an establishment of a transformerstation for the lightrail and some smaller changes on the pavement and bicycle path

     

    7: Lundtoftegårdsvej 98 to Lundtofte Station

    • The work here is expected to be done ultimo 2024. 
    • The construction work in this area includes an establishment of a transformer station for the light rail and some smaller changes on the pavement and bicycle path

     

Light rail time line in english
Light rail time line in english

 

Stay up-to-date on the latest road diversions through the following map from Vejdirektoratet. 

Plan your trip

  • If you travel by bicycle

    Google Maps

    If you are travelling in Lyngby by bicycle, you can use navigationssystems like Google Maps, that can show you the fastest route. 

    Bicycles
    Bicycles
  • If you travel by car

    Parking system 

    If you are travelling in Lyngby by car, can you use our parking system by using the blue signs around town. The signs shows, how mange parking spaces are available. 

     

    DR P4 Radio

    If you want to receive information about the traffic by radio, you can use DR P4 Radio, which broadcasts traffic information in collaboration with Vejdirektoratet. 

     

    Traffic information 

    If you go to www.trafikinfo.dk and search for Lyngby, you can see an overview of the road work in Lyngby. 

    Parkering system
    Parkering system
  • If you travel by bus or train

    Rejseplanen

    You can use the danish platform www.rejseplanen.dk to plan your trip from A to B by public transportation. Rejseplanen is also available as an app. 

     

    Din Offentlige Transport (DOT)

    You can also use DOT to find the latest news about public transportation. 

    Lyngby Station
    Lyngby Station